Hubbard Park tent sub-flooring
| | | | | | | | |

2009 University of Iowa Orientation at Hubbard Park

The Daily Iowan
Hubbard Park tent sub-flooring
Hubbard Park tent sub-flooring

KC McGinnis/The Daily Iowan UI engineering alum Tom Metzger (left), UI engineering students Kirk Heck and Logan Gassmann remove flooring on Thursday from the grounds at Hubbard Park, one of the last steps in removing a tent that was erected for UI Orientation. The crew members said the tent took about eight hours to raise and another eight hours to take down. © Copyright 2009 The Daily Iowan

Similar Posts